Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Mar 4, 2016 20:08:06 GMT
|
|
|
Post by rocketmanbkk on Mar 4, 2016 20:11:07 GMT
How much did you charge for that job?
Did you do it alone?
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Mar 4, 2016 20:14:51 GMT
The stack took me about half a day and I'm fitting a down stairs bathroom too, if it was just the stack I'd want at least £200 labour.
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Mar 4, 2016 20:15:42 GMT
Sorry, and yes on my own.
|
|
|
Post by tomplum on Mar 4, 2016 20:22:18 GMT
I've done many on my own too, plumbers just do,
|
|
|
Post by tomplum on Mar 4, 2016 20:25:59 GMT
|
|
|
Post by rocketmanbkk on Mar 4, 2016 20:26:57 GMT
I saw that vid a while ago
Good job
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Mar 4, 2016 20:29:53 GMT
Nice vid Tom especially the bit where you say "arhh fucking talking bollocks again"...
|
|
Deleted
Deleted Member
Posts: 0
|
Post by Deleted on Mar 4, 2016 20:33:38 GMT
On my one I needed two 45's to bring the bath waste in but had none on the van so made do with two 90 spigots.
|
|
|
Post by tomplum on Mar 4, 2016 20:41:17 GMT
you do what you have to PB, especially when the traffic means a 2/3 hours lost on the job, smiley-transport016 big bike
|
|
|
Post by rocketmanbkk on Mar 5, 2016 11:56:31 GMT
Tom, do you know the short boss pipes? How did you cut the holes out? Also, I may be being stupid here, how can you tell solvent weld to push fit as I see they do push fit connectors.
Can I send you a pic of one I need to replace please for your advice & comments? I've been running scared from doing it but now the weathers drying out I need to do it!
Cheers, Rct
|
|
|
Post by rocketmanbkk on Mar 5, 2016 11:58:44 GMT
|
|
|
Post by rocketmanbkk on Mar 5, 2016 12:02:24 GMT
I don't really want to pull the bottom piece out of the ground.
Can I cut it before the first clip & put a straight connection on, then drainpipe up to the short boss, drill out the holes to connect the shower (left pipe), basin (top pipe) & bath waste (right pipe), then connect another drain pipe on top going up & over the gutter to vent smells away with a cap on top?
The clips need to stay as they're now under the painter render but they seem to unclip which is good.
The pipes aren't leaking or anything, they just look tatty so new black shiny will look better.
|
|
|
Post by rocketmanbkk on Mar 5, 2016 12:05:03 GMT
On pic 4, the boss pipe sits in a straight connection. Can't the boss pipe just fit on the pipe?
|
|
|
Post by rocketmanbkk on Mar 5, 2016 12:05:44 GMT
Sorry for all the questions on a Saturday!
|
|