Post by rocketmanbkk on Aug 25, 2020 16:05:01 GMT
|
|
|
Post by tomplum on Aug 25, 2020 18:53:50 GMT
nice neat work that rocky,
|
|
|
Post by rocketmanbkk on Aug 25, 2020 19:40:29 GMT
nice neat work that rocky, Thanks Tom
|
|
|
Post by woodbine66 on Aug 25, 2020 20:20:13 GMT
Second what Tom says. The one chased into the wall is a lot more effort, but the result looks much better.
|
|
|
Post by crowsfoot on Aug 26, 2020 6:47:10 GMT
Neatly done Rocky, two pipe system, seeing those joist notches and floorboards laid about takes me back to my time when I was doing back to back heating jobs (bloody hard work it was too).
However, I'm not so keen on those chased in pipes, something that I've never done even in the 70s when every customer wanted every pipe buried in their walls.
What's the plan for making good to them?
|
|
|
Post by rocketmanbkk on Aug 26, 2020 14:53:24 GMT
Neatly done Rocky, two pipe system, seeing those joist notches and floorboards laid about takes me back to my time when I was doing back to back heating jobs (bloody hard work it was too). However, I'm not so keen on those chased in pipes, something that I've never done even in the 70s when every customer wanted every pipe buried in their walls. What's the plan for making good to them? Making good the chases? Wrap the pipes & bonding then the plasterers going in for a full house skim. I’ve never chased walls for ch pipes but it’s all good practice. Hard work though. Dusty & dirty too. I wouldn’t want to chase walls everyday.
|
|